Show menu

News

18
Jun

Modelling of trapped air pockets in hydraulic piping systems

Slovenian Research Agency (ARRS) granted co-funding for applied research project Modelling of trapped air pockets in hydraulic piping systems on June 18, 2019. Litostroj Power is a leading organization in collaboration with the Faculty of Mechanical Engineering, University of Ljubljana.
Read more
29
May

Litostroj Power received SAP Quality Award

Litostroj Power received a Bronze Award in Innovation Category in Central Eastern Europe for greenfield SAP S/4 Hana implementation. Award ceremony took place at the largest SAP conference in Czech Republic, which was held in Cubex Center Prague on April 29.
Read more
23
May

Students from The University of Kansas (USA) again visited Litostroj Power

The next generation of students of Engineering and Business program from The University of Kansas (USA) visited Litostroj Power. We presented them what we do, how do we do it and what are our specialties in the industry.
Read more
19
Apr

Bronze Winner of the SAP Quality Awards

We are proud to announce that Litostroj Power has been selected as the Bronze Winner of the SAP Quality Awards for SAP S/4 HANA implementation in the Innovation Category in Central Eastern Europe.
Read more
08
Apr

Litostroj Power at Hydro 2019 in Africa

Litostroj Power has participated as exhibitor at conference Africa 2019 – “Water storage and hydropower Development for Africa”. Conference was organized in Windhoek, capital city of Namibia.
Read more
04
Apr

Litostroj Power and Orkusalan from Iceland signed Amendment to the contract

Amendment to the contract for Lagarfoss U1 is signed for additional turbine works and refurbishment of generator parts.
Read more
11
Feb

Litostroj Power and Verbund Hydro Power GmbH from Austria signed a contract for project Malta Oberstufe

Contract consists of design, construction, production, supply, assembly and putting 2 valves DN 2300 PN 32 into operation.
Read more
31
Jan

Litostroj Power signed a contract for refurbishment of Unit 2 at HPP Piva in Montenegro

Consortium of Litostroj Power d.o.o, Končar - Generatori i motori d.d. and Elektroremont d.o.o. Subotica signed the contract for general overhaul of Unit 2 at HPP Piva in Montenegro.
Read more
25
Jan

Litostroj Power shipped first runner for HPP Häusling

Litostroj Power shipped first runner for HPP Häusling in Austria for Verbund Hydro Power Gmbh. The Häusling power station boasts a world primacy with its 744 m high downward flow from the Zillergründl reservoir – a downward flow equalling to two Eiffel Towers. It is the highest downward flow onto a Francis turbine impeller in the world.
Read more
03
Jan

Daughter company ČKD Blansko Engineering with new name

Part of Litostroj Power Group is also ČKD Blansko Engineering, which renamed into Litostroj Engineering with beginning of the year 2019.
Read more