Show menu

News - 2019

25
Jan

Litostroj Power shipped first runner for HPP Häusling

Litostroj Power shipped first runner for HPP Häusling in Austria for Verbund Hydro Power Gmbh. The Häusling power station boasts a world primacy with its 744 m high downward flow from the Zillergründl reservoir – a downward flow equalling to two Eiffel Towers. It is the highest downward flow onto a Francis turbine impeller in the world.
Read more
03
Jan

Daughter company ČKD Blansko Engineering with new name

Part of Litostroj Power Group is also ČKD Blansko Engineering, which renamed into Litostroj Engineering with beginning of the year 2019.
Read more